Wednesday, May 6, 2015
Bake Oven Knob: Day 4 (6-May-2015)
Bottles, bottles, bottles, plastic bottles. Today was the perfect temperature. I arrived after a slight rain and it was a nice break from the temps in the 80's the past two days. I went right for the main trash slide. The whole process of filling three bags went very quickly. If there are more days like this, the project is going to go a lot faster, I just need to remember to take more bags.
Getting to the trash slide.
I have been trying really hard to leave the area as undisturbed as possible while doing this.
The edge of the trash slide.
The photos are all much of the same.
This was the find of the day. Who knows how or why it was down there.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment